No Boundaries by Alex Mar6/6/2023 Starting Thu Jun 1 at 9:00 AM PDT until Tue Oct 31 at 3:00 PM PDT. Utility work planned between Exit 16 and East Wellington Rd for 0.7 km (Nanaimo). Next update time Sun Jun 11 at 12:00 PM PDT. SB lanes closed 24/7 at the Tsable River Bridge. Starting Wed May 24 at 12:00 PM PDT until Sun Jun 11 at 12:00 PM PDT. Bridge maintenance planned between Buckley Bay Rd and Cook Creek Rd for 13.8 km (15 to 28 km south of Cumberland). Next update time Fri May 19 at 12:00 PM MDT. Alt Route available via Hwy 95 and Hwy 93S. Overnight closures 10PM to 7AM Sun to Fri. Delays of 30 min 9AM to 3PM Mon to Sat and 8PM to 10PM Sun to Fri. Construction work between Golden Donald Upper Rd and Yoho Bridge for 5.3 km (2 to 7 km east of Golden). Next update time Fri Jun 2 at 5:00 PM PDT. Oversize loads accommodated 7AM to 5PM, Mon to Sat, by calling in advance to the Traffic Coordinator: (250) 961-6685. Chase Creek Bridge: Reduced lane width: 3.95m, NO centerline barrier or delineation. Bridge construction between Coburn St and Shuswap Ave (Chase). Next update time Fri May 19 at 4:30 PM PDT. Road open with sections of single lane alternating traffic. Loads over 3.8 meters in width restricted. Road construction work between Ainslie Rd N and Kanaka Station Rd for 16.1 km (Jackass Mountain Summit). Next update time Fri May 19 at 5:00 AM PDT. Paving operations at 104th Avenue Exit Ramp. Next update time Wed May 31 at 8:00 AM PDT. Ferry is currently out of service at Big Bar Reaction Ferry (Big Bar Reaction Ferry). Big Bar Reaction Ferry, in both directions.
0 Comments
Leave a Reply. |